HIRAKUD  DAM 

1. Introduction: - 

                                    Hirakud Dam Project is built across river Mahanadi at about 15 Kms. upstream of Sambalpur town in State of Odisha.  This happens to be the first post independence major multipurpose river valley project in India. The dam is 6 Kms from NH 6 . The nearest rail head is Hirakud railway station (S.E.R) which is 8 Kms from the dam site.

                                    The project provides 1,55,635 Hects of Kharif and 1,08,385 Hects of Rabi irrigation  of Sambalpur, Bargarh, Bolangir, and Subarnpur. The water released through power house irrigates further 436000 Hects of CCA in Mahanadi delta. Installed capacity for power generation in 307.5 MW through its two power houses at Burla , at the right bank to and Chiplima , at 22 Kms down stream of dam . Besides the project provides flood protection to 9500 sq Kms of delta area in district of Cuttack and Puri. 

2. Brief history of the Project:

                                    After high floods of 1937, Sir M. Visveswararya gave proposal for detailed investigation for storage reservoirs in Mahanadi basin to tackle problem of floods in Mahanadi  delta, In 1945, it was decided under the chairmanship of Dr. B.R.Ambedkar, the then Member of Labour in Govt. of India that the potentialities of river Mahanadi should be fruitfully and expenditiously investigated for multipurpose use. Central Water- ways Irrigation and Navigation Commission took up the work. The foundation stone of Hirakud Dam was laid by Sir Howthrone Lewis, the then Governor of Odisha on 15th March 1946. The project report was submitted to Government in June 1947. The first batch of concrete was laid by Pandit Jawaharalal Neheru on 12th April 1948. The project was formally inaugurated by Prime Minister Pt. Jawaharlal Nehru on 13th, January 1957. Power generation along with supply for irrigation started progressively from 1956 and full potential was achieved by 1966.  

PROJECT FEATURES.

Hirakud dam is a composite structure of  Earth, Concrete and Masonry.  The main dam having an overall length of 4.8 K.m. spans between hills Lamdungri on left hand Chandili Dunguri on the right. The Dam is flanked by 21 K.Ms. long earthen dykes both on left and right sites to close the low suddles beyond the abutment hills.  It has the distinction of being the longest dam in the world, being 25.8 K.Ms. long with dam and dykes taken together.  It has also the rare distinct of forming the biggest artificial lake in Asia with reservoir spread of 743 sq Kms at full reservoir level. 

Hirakud dam intercepts 83400 sq. km (32200 sq miles) of Mahanadi catchments. The reservoir has a storage of 5818 M. Cum with gross of 8136 M Cum. 

4. Cost: The Completed Cost of the Project was Rs.100.02 crores (in 1957) 

SALIENT FEATURES

(A)            HYDROLOGICAL :- 

(a)       Catchment                                  -            83400 Sq. Kms (32200 sq miles)

(b)      Rain fall(mm)        -      Original         Revised

      Mean annual             -      1381(1900 – 45)      1088

      Maximum annual       -      1809 (in 1919)      2518

      Minimum annual         -       940 (in  1902)        607

(c)      Run Off (M Hect. M)      -      Original      Post Construction

                        Average annual                            6.17                            3.36   

                                                                        (1926-46)             (1958-92)

Maximum annual                    8.62                                    9.09           

                                                (1919)                        (1961)

Minimum annual                     2.54                                    1.14

                                                (1902)                        (1979) 

(B)            DAM AND RESERVOIR

      Top dam level               R.L 195.680M.      (R.L.642 ft.)

      F.R.L/ M. W. L            R.L  192.024M      (R.L 630 ft.)

      Dead storage level         R.L 197.830 M      (R.L 590 Ft)

                        Storage  capacity                              Original                     Revised

                        In M Cum (M. Ac. Ft.)                                                          (1988)

                        Gross                                                  8136 (6.60)             7189 (5.83)

                        Live                                                     5818 (4.72)             5375 (4.36)

                        Dead                                                 2318 (1.88)             1814 (1.47)

                        Water            spread area at F.R.L              743 Sq. Km.                     

                                                             At D.S.L               274 Sq. Km.

                        Maximum fetch       At  F.R.L                      83.2     Km.

                        Total length of Dam                                     4800       M.

                        Length of dyke, Left Dyke                          9337   M in five gaps.

                                                       Right Dyke                 10759  M in one stretch.

                        Total quantity of earth work in Dam           18.1 M  Cum.

                        Total quantity of concrete and                    1.07 M. Cum 

(c)      SPILLWAY

            Spillway capacity 42450 cumecs (15 lakhs cusecs)

            Crest level                     - R.L. 185.928 M ( R.L. 610 ft.)

            Size of sluices               - 3.658 x 6.20 M (12x 2034 ft)

            No. of sluices               - 64 (40 on left and 24 on right)

            Sill of sluices                  - R.L. 155.448 M (R.L. 510 ft)

            No. of crest gates          - 34 ( 21 on left and 13 on right)

            Size of crest gates          - 15.54 M x 6.10 M. (51x 20 ft.)

            Types – Solid gravity with ogee profile and skijump bucket. 

(D)      POWER GENERATION:

            Installed Capicity

            At Burla                                 - 5 x 37.5

                                                         -         2x24.0 = 235.50 MW 

At Chiplima                           - 3x24        = 72.00 MW

Total                                                       = 307.50 MW 

Length of the power channel                - 22.40 Km.

Full supply discharge of power             - 22.40 Km

channel (beyond escape)

Full supply discharge of chiplima P.H. – 333.4 cumecs.

Bed width of power channel ;

                                    Upto escape       -75.5 M

                                    Beyond escape   - 52.5 M

 